Construction Alerts

Parking Lot Closures

None At This Time


Lane Detours/Closings/Transit Stop Shifts

Yarbrough Drive - 5/14/18 - 8/1/2018

Beginning May 14, 2018 a traffic shift will begin on Yarbrough Drive Extension,for steam tunnel repairs. The following information details the roadways, parking spaces and transit stops that will be impacted during the project:

  • Yarbrough Drive will be closed to through traffic at the Mann South lot and Yarbrough lot.
  • Yarbrough Drive at Stinson Drive will adopt a new traffic pattern for one-way traffic during the duration of the project.
  • Pedestrian and vehicular traffic should follow alternate routes and obey all posted signs. *All work is subject to change due to weather and other unforeseen circumstances.*

    View Pedestrian/Vehicular Detours Here

Cates Avenue - (TBD) - Spring 2020 (estimated completion)

Beginning May 14, 2018 Cates Ave. will shift to one way only traffic between Morril Dr. and Dan Allen Dr for the Carmichael Gym Project. The following information details roadways, parking spaces and transit stops that may be impacted during the project:

  • Cates Avenue will shift to one way only between Morrill Dr. and Dan Allen Dr. Traffic will not be allowed to flow westbound on Cates Ave. towards Dan Allen Dr.
  • Parking located directly in front of the Talley Student Union along Cates as well as approximately 30 spaces in the Carmichael lot will be blocked off for contractor staging.
  • Parking along Morrill Dr. adjacent to the Dail Softball Stadium field will be used for an expanded pedestrian walkway.
  • The Wolfline stop at Carmichael Gym will move approximately 200 feet south of its current location.
  • Pedestrian and vehicular traffic should follow alternate routes and obey all posted signs. *All work is subject to change due to weather and other unforeseen circumstances.*

    View Pedestrian/Vehicular Detours Here